Primavera P6 Villa Schedule Creation

Замовник: AI | Опубліковано: 18.04.2026
Бюджет: 30 $

I already have a Primavera P6 schedule template I like to use for my residential villa builds, but it still needs to be populated and fine-tuned for this specific project. What I need from you is a complete, resource-loaded programme that includes every relevant activity, clear relationships, and realistic start-to-finish dates for each phase—from site preparation right through to client hand-over. Although the template structure is set, I don’t yet have a full activity list for this villa. I’ll supply the architectural and MEP drawings, plus any specifications you request; you will extract the tasks, organise them logically, and weave them into the existing P6 framework. All dependencies, calendars, and resource assignments must align with best practices so the schedule is both practical in the field and ready for baseline approval. Key deliverables: • Updated Primavera P6 file (.xer) with the complete WBS, activities, relationships, and resource loading • PDF export of the Gantt chart and activity list for quick reference • Short narrative explaining scheduling assumptions, calendars, and any constraints you applied I’d like the first draft within a week so we can review critical path, float, and manpower distribution together before finalising the baseline. Let me know your Primavera experience and how you normally tackle activity definition when drawings are the main input.